A can finish a job in 10 days and B in 15 days. They work together for 3 days, then A leaves and C joins B, and the two finish the job in 3 more days. How long would C alone take?

  1. A. 15 days
  2. B. 12 days
  3. C. 10 days
  4. D. 20 days

Correct answer: C. 10 days

In 3 days A and B do 3(1/10 + 1/15) = 1/2. B and C finish the other half in 3 days, so B + C = 1/6 per day and C = 1/6 − 1/15 = 1/10: 10 days.