A can do a job in 20 days and B in 30 days. They start together, but A leaves 5 days before the job is finished. In how many days is the job finished?

  1. A. 12
  2. B. 17
  3. C. 14
  4. D. 15

Correct answer: D. 15

If it takes t days, A works t − 5 days: (t − 5)/20 + t/30 = 1 gives 5t = 75, t = 15. 12 is the time if both work throughout.