Civil EngineeringVery hard

Using Hazen's formula k = C·D10² (k in cm/s, D10 in cm) with C = 116 and D10 = 0.3 mm, the permeability is

  1. A. 3.4800 cm/s
  2. B. 0.3480 cm/s
  3. C. 10.4400 cm/s
  4. D. 0.1044 cm/s

Correct answer: D. 0.1044 cm/s

D10 = 0.03 cm; k = 116×0.03² = 0.1044 cm/s.

More Geotechnical Engineering & Foundations (Civil) questions

Exams that ask this topic