Civil EngineeringVery hard

For a level cutting (width 10 m, side slopes 2:1) with depths 1.5 m and 4 m at sections 30 m apart, the prismoidal correction (trapezoidal volume − prismoidal volume) is

  1. A. 62.50 m³
  2. B. 78.13 m³
  3. C. 125.00 m³
  4. D. 31.25 m³

Correct answer: A. 62.50 m³

Vtrap = 1372.5, Vprism = 1310.0; correction = 62.50 m³ (equals L·sl(d2−d1)²/6 for this section).