Civil EngineeringVery hard

A two-phase signal has lost time 12 s per cycle and critical flow ratios 0.3 and 0.2. With Webster's cycle time, the effective green time of the first phase is

  1. A. 13.6 s
  2. B. 27.6 s
  3. C. 20.4 s
  4. D. 17.0 s

Correct answer: C. 20.4 s

C0 = (1.5×12+5)/(1−0.50) = 46.0 s; g1 = (C0−L)y1/Y = 20.4 s.

More Transportation, Surveying & Estimation (Civil) questions

Exams that ask this topic