AccountingHard

Budgeted factory overhead is Rs 2,90,000 for 40000 machine hours. Actual overhead incurred was Rs 2,80,000 for 36000 machine hours. Overhead absorbed at the pre-determined rate and the result are:

  1. A. Rs 10,000 over-absorbed
  2. B. Rs 29,000 under-absorbed
  3. C. Rs 19,000 under-absorbed
  4. D. Rs 19,000 over-absorbed

Correct answer: C. Rs 19,000 under-absorbed

Rate = 290000/40000 = 7.25/hr; absorbed = 7.25 x 36000 = 261000; actual 280000; under-absorbed by 19000.