Data Structures & AlgorithmsVery hardCodeforces Div 2 C · GATE CS
A directed acyclic graph has the vertices A, E, F, J, S, U and the arcs A→E, A→S, A→F, E→J, E→S, E→F, E→U, J→U, F→U. Two players alternately move a single token along an arc. A player who cannot move loses. The Grundy (nim) value of a vertex is the mex (smallest non-negative integer not present) of the Grundy values of its out-neighbours, with 0 for a sink. What is the Grundy value of A?
- A. 5
- B. 4
- C. 3
- D. 2
Correct answer: C. 3
Evaluate the Grundy values from the sinks backwards; the value of A is 3. Using the number of out-arcs in place of the Grundy values gives 2, and the longest path from A is 3.
Practise more Trees, Graphs, Recursion and Dynamic Programming questionsTrees, Graphs, Recursion and Dynamic Programming: notes and key points
More Trees, Graphs, Recursion and Dynamic Programming questions
- A pile holds p stones. In one move a player removes exactly s stones, where s is one of {3, 4, 6} and s ≤ the pile size. The player who…
- A tree has the vertices C, F, G, I, N, R, S and the edges R–G, R–S, S–I, I–C, C–F, R–N. A set D dominates the tree if every vertex is in D…
- A tree has the vertices B, C, F, K, M, N, Q, R, X, Z and the edges C–X, X–Z, X–M, M–K, C–B, Z–R, B–Q, M–N, N–F. What is the minimum number…
- A tree has vertices with values in brackets: M[0], R[5], A[9], G[-4], H[9]. The edges are M–R, M–A, R–G, M–H. A path is any sequence of…
- Bellman–Ford is run from source P on the directed graph whose arcs (weights in brackets) are listed in the order they are relaxed: Z→S…
- A directed graph has the vertices F, J, N, P, R, Z and the arcs P→F, P→Z, P→N, J→N, R→P, F→P, F→R, Z→P, Z→N, N→F, N→Z. How many strongly…