CS FundamentalsVery hardGATE CS · Advanced

Three periodic tasks (C, T) with deadline equal to period, all released at t = 0, are: (1, 4), (4, 9), (4, 15). Their total utilisation is 0.961, below 1. Under preemptive rate-monotonic scheduling (shorter period = higher priority), at what time does the first deadline miss occur?

  1. A. t = 15
  2. B. t = 180
  3. C. t = 14
  4. D. t = 19

Correct answer: A. t = 15

Simulate RM on a unit grid: the lowest-priority job is starved by the repeated releases of the others and is still unfinished at its deadline t = 15, even though U < 1 (EDF would meet every deadline since U <= 1). RM's guarantee needs U below about 0.78 for three tasks.