Indian EconomyHardUPSC Prelims · SSC CGL Tier 2
The Delhi–Mumbai Industrial Corridor was planned along which piece of transport infrastructure?
- A. The Golden Quadrilateral national highway
- B. The Western Dedicated Freight Corridor
- C. The Mumbai–Ahmedabad high-speed rail line
- D. The Sagarmala chain of coastal ports
Correct answer: B. The Western Dedicated Freight Corridor
DMIC was conceived in the late 2000s around the high-capacity Western Dedicated Freight Corridor between Dadri and JNPT, with new industrial cities along it. The Golden Quadrilateral and the high-speed rail line are separate projects, and Sagarmala is a port programme.
हिंदी में
दिल्ली–मुंबई औद्योगिक गलियारे की योजना परिवहन अवसंरचना के किस भाग के साथ-साथ बनाई गई थी?
- A. स्वर्णिम चतुर्भुज राष्ट्रीय राजमार्ग
- B. पश्चिमी समर्पित माल गलियारा
- C. मुंबई–अहमदाबाद हाई-स्पीड रेल लाइन
- D. सागरमाला तटीय बंदरगाह श्रृंखला
उत्तर: B. DMIC की परिकल्पना 2000 के दशक के अंत में दादरी और JNPT के बीच उच्च क्षमता वाले पश्चिमी समर्पित माल गलियारे के इर्द-गिर्द की गई थी, जिसके साथ-साथ नए औद्योगिक नगर बनने थे। स्वर्णिम चतुर्भुज और हाई-स्पीड रेल अलग परियोजनाएँ हैं, और सागरमाला बंदरगाह कार्यक्रम है।
Practise more Sectors of the Economy and Government Schemes questionsSectors of the Economy and Government Schemes: notes and key points
More Sectors of the Economy and Government Schemes questions
- The Western Dedicated Freight Corridor runs between:
- Under the UDAN regional connectivity scheme (2016), fares on routes to unserved airports are kept low mainly by:
- The UJALA scheme, implemented by Energy Efficiency Services Limited from 2015, mainly involved:
- Under the UDAY scheme of 2015 to revive power distribution companies, States were to take over what share of their discoms’ debt as on 30…
- Which scheme, launched in 2017, aimed at giving electricity connections to all remaining households in rural and urban areas?
- Match the PM-KUSUM component with its purpose: A. Component A B. Component B C. Component C; 1. Solarising existing grid-connected farm…