GATE Computer ScienceVery hardGATE CS (PYQ pattern)
Processor A runs a program at 3.0 GHz with CPI 1.6. Processor B, with the same ISA and the same compiled program, runs at 2.4 GHz. What is the largest CPI B may have if it must be at least 10% faster than A (performance = 1 / execution time)?
- A. 1.280
- B. 1.152
- C. 1.164
- D. 1.455
Correct answer: C. 1.164
A takes 1.6/3.0 = 0.533 ns per instruction. 10% faster means time ≤ 0.533/1.1 = 0.485 ns, so CPI_B ≤ 0.485 × 2.4 = 1.164. Equal speed would allow 1.280; '10% less time' (× 0.9) gives 1.152; ignoring the clock change gives 1.455.
Practise more Computer Organization and Architecture questionsComputer Organization and Architecture: notes and key points
More Computer Organization and Architecture questions
- A write-back cache has 64-byte blocks, 2 ns hit time and 5% miss rate. Over an 8-byte bus, memory delivers the first 8 bytes 60 ns after a…
- An 8 × 8 matrix is stored in 8 memory banks. A bank is busy for 6 cycles after an access starts (an access started in cycle t completes at…
- The IEEE 754 single-precision word 0xC1E80000 is multiplied by 2⁻¹³¹ (the result is exact). What is the bit pattern of the product?
- A radix-4 (modified) Booth multiplier handles an unsigned 32-bit multiplier. How many partial products must it generate in the worst case…
- Consider a classic in-order 5-stage pipeline in which registers are read in ID, written in WB, and every instruction passes through all…
- A 6-stage pipeline has stage delays 120, 180, 150, 210, 90 and 160 ps with a 30 ps latch after each stage; the unpipelined machine takes…