Engineering MathematicsVery hardGATE CSE
X and Y are independent exponential random variables with rates 1 and 2 (means 1 and 1/2). What is E[max(X, Y)]?
- A. 3/2
- B. 4/3
- C. 7/6
- D. 5/6
Correct answer: C. 7/6
E[max] = E[X] + E[Y] − E[min] = 1 + 1/2 − 1/3 = 7/6, since min(X, Y) is exponential with rate 3.
Practise more Engineering Mathematics (GATE) questionsEngineering Mathematics (GATE): notes and key points
More Engineering Mathematics (GATE) questions
- Five independent random variables are uniform on (0, 1). What is the variance of their sample median (the third smallest value)?
- Let A be the 3 × 3 matrix with 2 on the diagonal, −1 on the two off-diagonals adjacent to it (A₁₂ = A₂₁ = A₂₃ = A₃₂ = −1) and 0 elsewhere…
- Let A = [[1, 2], [3, 4]]. What is the trace of A⁵?
- What is the value of ∫ from 0 to π/2 of cos⁸x dx?
- A is a 3×3 real matrix with eigenvalues 1, 2 and 3, and B = A + 2A⁻¹. What is det(adj B)?
- Let u = (1, 2, 3, 4)ᵀ, v = (4, 3, 2, 1)ᵀ and A = I₄ + u vᵀ. What is det(A² − 3A)?