GeographyModerateSSC CGL · UPSC Prelims
The Salal and Baglihar hydroelectric projects in Jammu and Kashmir are on the river:
- A. Jhelum
- B. Chenab
- C. Ravi
- D. Indus
Correct answer: B. Chenab
Both projects are on the Chenab; the Kishanganga and Uri projects are on the Jhelum system and the Ranjit Sagar (Thein) dam is on the Ravi.
हिंदी में
जम्मू-कश्मीर में सलाल और बगलिहार जलविद्युत परियोजनाएँ किस नदी पर हैं?
- A. झेलम
- B. चेनाब
- C. रावी
- D. सिंधु
उत्तर: B. दोनों परियोजनाएँ चेनाब पर हैं; किशनगंगा और उरी परियोजनाएँ झेलम तंत्र पर हैं और रंजीत सागर (थीन) बाँध रावी पर है।
More Rivers of India questions
- The Tungabhadra, formed by the union of the Tunga and the Bhadra, is a tributary of the:
- The Indus enters Indian territory in Ladakh and flows between which two ranges?
- Which Himalayan tributary of the Ganga is known as the Karnali in Nepal?
- The Brahmaputra takes that name in Assam after the union, near Sadiya, of the Dihang with the:
- The Shivasamudram falls, where one of Asia’s earliest hydroelectric stations was set up in 1902, are on the:
- Which of these is NOT a tributary of the Godavari?