Management & CommerceVery hardMBA Placement · Six Sigma · Quality Analyst
A shaft's specification is 9.9–10.5 mm. The process mean is 10.25 mm and SD 0.1 mm (normal). What are Cpk and the expected out-of-spec rate?
- A. Cpk 1.00; about 2,700 ppm
- B. Cpk 0.83; about 6,440 ppm
- C. Cpk 0.83; about 6,210 ppm
- D. Cpk 1.17; about 230 ppm
Correct answer: B. Cpk 0.83; about 6,440 ppm
Cpk = min(10.5 − 10.25, 10.25 − 9.9) ÷ 0.3 = 0.25/0.3 ≈ 0.83. Out-of-spec = P(Z > 2.5) + P(Z < −3.5) ≈ 6,210 + 233 ≈ 6,440 ppm. 6,210 ignores the lower tail; 1.00 and 2,700 ppm describe a centred process with Cp = 1.
Practise more Operations, Supply Chain & Business Analytics questionsOperations, Supply Chain & Business Analytics: notes and key points
More Operations, Supply Chain & Business Analytics questions
- A p-chart uses an overall defective rate of 4%, with limits computed for each day's own sample size (3-sigma). Today's sample is 150 units…
- An X̄ chart's subgroup size is raised from 4 to 9, with the process SD unchanged. What happens to the distance between the 3-sigma control…
- In a sample of 27 cities, the correlation between ad spend and sales is r = 0.4. Testing H0: ρ = 0 at 5% (two-tailed; critical t with 25…
- Two unbiased demand forecasts have independent errors with SDs of 10 and 20 units. A planner combines them as w × F1 + (1 − w) × F2. Which…
- A 95% confidence interval for the difference in mean basket value (new layout − old) is ₹−0.4 to ₹3.2. Which statement is correct?
- A survey of 400 customers uses three strata: N = 6,000 (SD 10), 3,000 (SD 40) and 1,000 (SD 80). Under Neyman (optimum) allocation with…