Physics (JEE/NEET)HardJEE Main · JEE Advanced
A bucket of mass 2 kg holding 20 kg of water is raised at constant speed from a 10 m deep well by a rope of linear density 0.5 kg/m. Water leaks out at a steady rate so that the bucket is empty when it reaches the top. Taking g = 10 m/s², the work done in raising it is:
- A. 1450 J
- B. 1700 J
- C. 2200 J
- D. 1200 J
Correct answer: A. 1450 J
Bucket: 2(10)(10) = 200 J. Water (average load 10 kg over 10 m): 1000 J. Rope: its hanging weight falls from 50 N to 0, so the work is ½(50)(10) = 250 J. Total = 1450 J. Leaving out the rope gives 1200 J.
Practise more Work, Energy, Power and Collisions questionsWork, Energy, Power and Collisions: notes and key points
More Work, Energy, Power and Collisions questions
- A 1 kg block is gently placed at rest on a long horizontal belt moving at 4 m/s. The coefficient of kinetic friction between block and…
- A tennis ball of mass 0.10 kg approaches a heavy racket at 15 m/s. The racket is moving towards the ball at 10 m/s and its speed is not…
- A bungee jumper of mass 60 kg steps off a platform with an elastic cord of natural length 20 m and force constant 360 N/m, attached to the…
- A particle of mass 2 kg moving at 4 m/s collides head-on with a particle of mass 3 kg moving at 2 m/s in the opposite direction, and the…
- A ball is dropped from a height of 20 m onto a hard floor, with a coefficient of restitution 0.5 for every impact (g = 10 m/s²)…
- A block of mass m hangs at rest from a light vertical spring of force constant k, inside a lift. The lift then accelerates upwards at g/2…