Physics (JEE/NEET)HardJEE Main · JEE Advanced

A bucket of mass 2 kg holding 20 kg of water is raised at constant speed from a 10 m deep well by a rope of linear density 0.5 kg/m. Water leaks out at a steady rate so that the bucket is empty when it reaches the top. Taking g = 10 m/s², the work done in raising it is:

  1. A. 1450 J
  2. B. 1700 J
  3. C. 2200 J
  4. D. 1200 J

Correct answer: A. 1450 J

Bucket: 2(10)(10) = 200 J. Water (average load 10 kg over 10 m): 1000 J. Rope: its hanging weight falls from 50 N to 0, so the work is ½(50)(10) = 250 J. Total = 1450 J. Leaving out the rope gives 1200 J.

More Work, Energy, Power and Collisions questions

Exams that ask this topic