Quantitative AptitudeHardSSC CGL · RRB NTPC · IBPS PO
A would have finished a job 5 days earlier had he been 20% more efficient. In how many days does A actually finish the job?
- A. 30 days
- B. 25 days
- C. 36 days
- D. 24 days
Correct answer: A. 30 days
With 1.2 times the efficiency the time becomes d/1.2, so the saving is d − d/1.2 = d/6 = 5, giving d = 30. Taking the saving as 20% of d would give 25, the common slip.
हिंदी में
यदि A 20% अधिक कुशल होता, तो वह एक कार्य को 5 दिन पहले पूरा कर लेता। A वास्तव में उस कार्य को कितने दिन में पूरा करता है?
- A. 30 दिन
- B. 25 दिन
- C. 36 दिन
- D. 24 दिन
उत्तर: A. 1.2 गुना कुशलता होने पर समय d/1.2 हो जाता है, इसलिए बचत d − d/1.2 = d/6 = 5 है, अतः d = 30। बचत को d का 20% मान लेने पर 25 आता है, जो आम भूल है।
More Time and Work questions
- One man does as much work as 2 women or 4 children. A group of 5 men, 6 women and 8 children can finish a job in 12 days. After 4 days, 1…
- A man is 1.5 times as efficient as a woman. A team of 8 men and 12 women completes 3/4 of a job in 9 days. The rest is done by 4 men and 6…
- 12 men can finish a job in 15 days. Six men start it, and some women, each 60% as efficient as a man, join them from the first day so that…
- The water a pipe delivers per hour is proportional to the square of its diameter (same pressure). Three pipes of diameters 2 cm, 3 cm and…
- Inlet pipes A and B can fill an empty tank in 6 and 4 hours, and outlet pipe C can empty a full tank in 12 hours. A is opened first, B is…
- Pipes A and B fill an empty tank in 12 and 15 hours, and pipe C empties a full tank in 20 hours. They are opened one at a time for 1 hour…