Quantitative AptitudeVery hardSSC CGL Tier 2 · IBPS PO Mains
A and B together can do a job in 12 days, B and C together in 15 days, and A and C together in 20 days. All three work together until the job is done and are paid ₹ 7,200 in total, shared in proportion to the work done. B's share is:
- A. ₹ 2,400
- B. ₹ 3,600
- C. ₹ 1,200
- D. ₹ 3,000
Correct answer: B. ₹ 3,600
Adding the three pair rates gives 2(A + B + C) = 1/12 + 1/15 + 1/20 = 1/5, so A + B + C = 1/10. Then A = 1/10 − 1/15 = 1/30, B = 1/10 − 1/20 = 1/20 and C = 1/10 − 1/12 = 1/60, in the ratio 2 : 3 : 1. B's share = 3/6 × 7,200 = ₹ 3,600.
हिंदी में
A और B मिलकर एक कार्य 12 दिन में, B और C मिलकर 15 दिन में तथा A और C मिलकर 20 दिन में कर सकते हैं। तीनों कार्य पूरा होने तक साथ काम करते हैं और उन्हें कुल ₹ 7,200 मिलते हैं, जो किए गए कार्य के अनुपात में बाँटे जाते हैं। B का हिस्सा है:
- A. ₹ 2,400
- B. ₹ 3,600
- C. ₹ 1,200
- D. ₹ 3,000
उत्तर: B. तीनों जोड़ियों की कार्य-दरें जोड़ने पर 2(A + B + C) = 1/12 + 1/15 + 1/20 = 1/5, अतः A + B + C = 1/10। तब A = 1/10 − 1/15 = 1/30, B = 1/10 − 1/20 = 1/20 और C = 1/10 − 1/12 = 1/60, जो 2 : 3 : 1 के अनुपात में हैं। B का हिस्सा = 3/6 × 7,200 = ₹ 3,600।
More Time and Work questions
- A man is three times as efficient as a woman. 8 men and 12 women complete a job in 6 days. After 3 days, 2 men and 3 women leave, and the…
- Pipe A can fill a tank in 12 hours and pipe B in 15 hours, while a leak can empty the full tank in 20 hours. All three are opened…
- A takes 20% less time than B to do a job. Together they finish it in 20 days. How many days will A alone take?
- A can finish a job in 15 days and B in 20 days. They work together, but A is absent on every 3rd day (days 3, 6, 9, …) while B works every…
- Pipes A and B fill an empty tank in 12 and 16 hours, and pipe C empties a full tank in 24 hours. A is opened at 9 am, B at 10 am and C at…
- A, B and C can do a job alone in 12, 18 and 36 days. They start together, but A leaves 3 days before the job is finished, while B and C…