How many of the following statements are correct? 1. If A does a job in x days and B in y days, together they take xy/(x + y) days. 2. If 10 men take 12 days for a job, 15 men take 8 days. 3. If a pipe fills a tank in 4 hours and another empties it in 6 hours, together they fill the empty tank in 10 hours. 4. If A is 50% more efficient than B, A takes 50% less time than B.
- A. Only one
- B. Only three
- C. Only two
- D. All four
Correct answer: C. Only two
1 and 2 are true (120 man-days ÷ 15 = 8). 3 is false: 1/4 − 1/6 = 1/12, so 12 hours. 4 is false: time ∝ 1/efficiency, so A takes 1/1.5 = 2/3 of B's time, i.e. 33 1/3% less, not 50%.
हिंदी में
निम्नलिखित में से कितने कथन सही हैं? 1. यदि A किसी कार्य को x दिन में और B y दिन में करता है, तो साथ में वे xy/(x + y) दिन लेते हैं। 2. यदि 10 आदमी किसी कार्य में 12 दिन लेते हैं, तो 15 आदमी 8 दिन लेंगे। 3. यदि एक पाइप टंकी को 4 घंटे में भरता है और दूसरा उसे 6 घंटे में खाली करता है, तो साथ में वे खाली टंकी को 10 घंटे में भरते हैं। 4. यदि A, B से 50% अधिक कुशल है, तो A, B से 50% कम समय लेता है।
- A. केवल एक
- B. केवल तीन
- C. केवल दो
- D. सभी चार
उत्तर: C. 1 और 2 सही हैं (120 आदमी-दिन ÷ 15 = 8)। 3 गलत है: 1/4 − 1/6 = 1/12, इसलिए 12 घंटे। 4 गलत है: समय ∝ 1/कार्यक्षमता, इसलिए A, B का 1/1.5 = 2/3 समय लेता है, यानी 33 1/3% कम, 50% नहीं।
More Time and Work questions
- A can do a work in 30 days. He works alone for 10 days, after which B joins him and they finish the rest in 16 days. If instead B had…
- A, B and C can do a work in 10, 15 and 30 days respectively. A works every day, while B and C assist him on alternate days, B on the first…
- 3 men or 5 women can finish a work in 30 days. A man is paid ₹500 a day and a woman ₹280 a day. Is it cheaper to get the job done by men…
- A can do a work in 8 days working 9 hours a day, and B can do it in 12 days working 6 hours a day. If they work together 8 hours a day, in…
- Pipe A fills a tank in 6 hours, pipe B in 8 hours, and pipe C empties it in 12 hours. They are opened one at a time for an hour each in…
- Assertion (A): If 6 men can do a job in 10 days, 10 men can do it in 6 days. Reason (R): For a fixed amount of work, the number of men and…