Statement: A newly built flyover has developed visible cracks within two months of opening, and an inspection found that the cement used was below the specified grade. Courses of action: I. The flyover should be closed to heavy vehicles until a structural audit is completed. II. The contractor and the supervising engineers should be held accountable after an inquiry.

  1. A. Neither I nor II follows
  2. B. Only I follows
  3. C. Both I and II follow
  4. D. Only II follows

Correct answer: C. Both I and II follow

I protects public safety while the damage is assessed, and II addresses the cause (substandard material) through an inquiry rather than blind punishment. Both follow.

हिंदी में

कथन: एक नए बने फ्लाईओवर में खुलने के दो महीने के भीतर दिखाई देने वाली दरारें आ गई हैं, और निरीक्षण में पाया गया कि प्रयुक्त सीमेंट निर्दिष्ट श्रेणी से घटिया था। कार्यवाही के तरीके: I. संरचनात्मक जाँच पूरी होने तक फ्लाईओवर को भारी वाहनों के लिए बंद कर देना चाहिए। II. जाँच के बाद ठेकेदार और पर्यवेक्षक अभियंताओं की जवाबदेही तय की जानी चाहिए।

  1. A. न तो I और न ही II अनुसरण करता है
  2. B. केवल I अनुसरण करता है
  3. C. I और II दोनों अनुसरण करते हैं
  4. D. केवल II अनुसरण करता है

उत्तर: C. I नुकसान के आकलन के दौरान जन-सुरक्षा की रक्षा करता है, और II अंधाधुंध दंड के बजाय जाँच के माध्यम से कारण (घटिया सामग्री) का समाधान करता है। दोनों अनुसरण करते हैं।