CS FundamentalsHardInfosys · Accenture

In the V-model, against which development phase is integration testing designed?

  1. A. Requirements analysis
  2. B. Detailed (module) design
  3. C. Coding
  4. D. Architectural (high-level) design

Correct answer: D. Architectural (high-level) design

Each left-hand phase pairs with a right-hand test level: requirements - acceptance, system design - system testing, architectural design - integration testing, module design - unit testing.

More Software Engineering, Git and Cloud Basics questions

Exams that ask this topic