Three jobs must be assigned one each to three workers. Costs (₹ hundred), rows = jobs J1–J3, columns = workers W1–W3: J1: 9, 11, 14; J2: 6, 15, 13; J3: 12, 13, 6. What is the minimum total cost?

  1. A. 30
  2. B. 21
  3. C. 23
  4. D. 33

Correct answer: C. 23

Check the assignments: J1→W2, J2→W1, J3→W3 = 11 + 6 + 6 = 23, the lowest of the six possibilities. 21 adds each row's minimum (9 + 6 + 6) but uses W1 twice; 30 is the diagonal.