Planned production time is 480 minutes, of which 60 minutes are lost to breakdowns. The ideal cycle time is 0.5 min/unit. The machine produced 700 units, of which 665 were good. What is the OEE?

  1. A. 72.9%
  2. B. 79.2%
  3. C. 83.1%
  4. D. 69.3%

Correct answer: D. 69.3%

Availability = 420/480 = 0.875. Performance = (700 × 0.5)/420 = 0.8333. Quality = 665/700 = 0.95. OEE = A × P × Q = 69.3% (check: 665 × 0.5 ÷ 480 = 0.6927). 72.9% leaves out quality.