A shaft's diameter specification is 10.0 ± 0.6 mm. The process mean is 10.2 mm and the standard deviation is 0.15 mm. What is Cpk?

  1. A. 0.44
  2. B. 1.78
  3. C. 1.33
  4. D. 0.89

Correct answer: D. 0.89

Cp = (10.6 − 9.4) ÷ (6 × 0.15) = 1.33. Cpk = min(10.6 − 10.2, 10.2 − 9.4) ÷ (3 × 0.15) = 0.4 ÷ 0.45 = 0.89. Using the far side (0.8) gives 1.78; dividing by 6σ gives 0.44.