Management & CommerceHardMBA Placement · Quality Analyst
A factory buys a part from three suppliers: S1 supplies 50% (1% defective), S2 30% (2% defective) and S3 20% (5% defective). A part picked at random is defective. What is the probability it came from S3?
- A. 62.5%
- B. 20.0%
- C. 47.6%
- D. 28.6%
Correct answer: C. 47.6%
P(defective) = 0.005 + 0.006 + 0.010 = 0.021, so P(S3 | defective) = 0.010 ÷ 0.021 ≈ 47.6%. 62.5% compares defect rates alone (5/8) and ignores supply shares; 20% is the prior; 28.6% is S2's posterior.
Practise more Operations, Supply Chain & Business Analytics questionsOperations, Supply Chain & Business Analytics: notes and key points
More Operations, Supply Chain & Business Analytics questions
- A shaft's specification is 9.9–10.5 mm. The process mean is 10.25 mm and SD 0.1 mm (normal). What are Cpk and the expected out-of-spec rate?
- A p-chart uses an overall defective rate of 4%, with limits computed for each day's own sample size (3-sigma). Today's sample is 150 units…
- An X̄ chart's subgroup size is raised from 4 to 9, with the process SD unchanged. What happens to the distance between the 3-sigma control…
- In a sample of 27 cities, the correlation between ad spend and sales is r = 0.4. Testing H0: ρ = 0 at 5% (two-tailed; critical t with 25…
- Two unbiased demand forecasts have independent errors with SDs of 10 and 20 units. A planner combines them as w × F1 + (1 − w) × F2. Which…
- A 95% confidence interval for the difference in mean basket value (new layout − old) is ₹−0.4 to ₹3.2. Which statement is correct?