A is 60% more efficient than B, and together they finish a job in 12 days. How long would B take alone?
- A. 31.2 days
- B. 19.2 days
- C. 30 days
- D. 24 days
Correct answer: A. 31.2 days
Rates A : B = 1.6 : 1, so together = 2.6 B-units. B alone takes 12 × 2.6 = 31.2 days.
हिंदी में
A, B से 60% अधिक कुशल है, और साथ मिलकर वे किसी कार्य को 12 दिन में पूरा करते हैं। B अकेला कितना समय लेगा?
- A. 31.2 दिन
- B. 19.2 दिन
- C. 30 दिन
- D. 24 दिन
उत्तर: A. दरों का अनुपात A : B = 1.6 : 1, इसलिए साथ में = 2.6 B-इकाई। B अकेला 12 × 2.6 = 31.2 दिन लेता है।
More Time and Work questions
- A is 25% faster than B, and together they finish a job in 20 days. A works alone for 9 days and B then finishes the job. How many days…
- A can do a job in 20 days and B in 30 days. Owing to a power cut, both work at only 80% of their usual efficiency. How long will they take…
- A can do a job in 18 days and B is 50% more efficient than A. They start together; after some days A leaves and B finishes the rest in 4…
- 16 men working 9 hours a day dig a 72 m trench in 30 days. How many men working 12 hours a day can dig a 96 m trench in 24 days?
- A and B are paid ₹2,400 for a job that A alone can do in 8 days and B alone in 12 days. They work together, but A leaves 2 days before the…
- A does one-third of a job in 4 days. Then his efficiency rises by 50%. How many days does he take for the whole job?