A completes 2/7 of a job in 8 days. How long will he take for the whole job?
- A. 16 days
- B. 24 days
- C. 56 days
- D. 28 days
Correct answer: D. 28 days
1/7 of the job takes 4 days, so the whole job takes 28 days.
हिंदी में
A किसी कार्य का 2/7 भाग 8 दिन में पूरा करता है। पूरे कार्य में उसे कितने दिन लगेंगे?
- A. 16 दिन
- B. 24 दिन
- C. 56 दिन
- D. 28 दिन
उत्तर: D. कार्य के 1/7 भाग में 4 दिन लगते हैं, इसलिए पूरे कार्य में 28 दिन लगेंगे।
More Time and Work questions
- A can do a job in 25 days and B in 20 days. A works for 5 days and leaves. How long does B take to finish the rest?
- Pipe A fills 1/3 of a tank in 10 minutes and pipe B fills 1/4 of it in 15 minutes. How long will both together take to fill the tank?
- Pipes A and B fill a tank in 24 and 32 minutes. Both are opened together. After how many minutes should A be closed so that the tank is…
- Pump A can empty a full pond in 12 hours and pump B in 15 hours. Rain inflow alone would fill the pond in 20 hours. With both pumps…
- A does 20% less work than B each day. Together they finish a job in 16 days. How long would B take alone?
- A patch of water hyacinth doubles its area every day and covers a whole lake at the end of day 10. At the end of which day was half the…