Quantitative AptitudeModerateSSC CHSL · SSC CGL
30 men build a 120 m wall in 8 days. How many men are needed to build a 90 m wall in 5 days?
- A. 30
- B. 45
- C. 32
- D. 36
Correct answer: D. 36
Each metre takes 30 × 8/120 = 2 man-days. 90 m need 180 man-days; in 5 days that is 36 men.
हिंदी में
30 आदमी 8 दिन में 120 m लंबी दीवार बनाते हैं। 5 दिन में 90 m लंबी दीवार बनाने के लिए कितने आदमी चाहिए?
- A. 30
- B. 45
- C. 32
- D. 36
उत्तर: D. प्रत्येक मीटर में 30 × 8/120 = 2 आदमी-दिन लगते हैं। 90 m के लिए 180 आदमी-दिन चाहिए; 5 दिन में यह 36 आदमी होते हैं।
More Time and Work questions
- The efficiencies of A and B are in the ratio 5 : 3, and together they finish a job in 15 days. How long would A take alone?
- A finishes 7/10 of a job in 14 days, and B finishes the rest in 9 days. How long would they take to do the whole job together?
- 12 typists type 360 pages in 5 hours. How many typists are needed to type 600 pages in 4 hours?
- A is 40% more efficient than B, and C is 20% less efficient than B. If B alone takes 44 days to finish a job, how long will A and C take…
- Pipe A alone fills a tank in 12 hours. When the tank is half full, pipe B, which can fill it alone in 6 hours, is also opened. How long…
- Pipes A and B fill a tank in 20 and 25 minutes. A is opened first. After how many minutes should B be opened so that the tank is full…