Mechanical EngineeringHard

An X-bar control chart is based on samples of size 4 from a process with mean 50 and standard deviation 2. The upper 3-sigma control limit is

  1. A. 56
  2. B. 55
  3. C. 53
  4. D. 52

Correct answer: C. 53

UCL = mean + 3 sigma/sqrt(n) = 50 + 3*2/2 = 53.

More Manufacturing, Materials & Industrial Engineering (ISRO Mech) questions

Exams that ask this topic