Management & CommerceHardOps MT · Supply chain · MBA placement pattern
A packing line has three stages in series: a feeder (reliability 0.95), a sealing stage with two identical sealers in parallel (each 0.80, either one suffices), and a labeller (0.90). What is the line's reliability, and what would it be without the backup sealer?
- A. 0.9120 with backup; 0.684 without
- B. 0.8208 with backup; 0.760 without
- C. 0.8208 with backup; 0.684 without
- D. 0.8550 with backup; 0.684 without
Correct answer: C. 0.8208 with backup; 0.684 without
Sealer pair = 1 − 0.2² = 0.96. Line = 0.95 × 0.96 × 0.90 = 0.8208. Without the backup: 0.95 × 0.80 × 0.90 = 0.684. 0.912 leaves out the labeller; 0.855 drops the sealing stage entirely.
Practise more Operations, Supply Chain & Business Analytics questionsOperations, Supply Chain & Business Analytics: notes and key points
More Operations, Supply Chain & Business Analytics questions
- A critical sensor has reliability 0.85. Identical sensors can be installed in parallel (the stage works if at least one works). What is…
- A buyer uses a single sampling plan: inspect n = 20 items from each lot and accept the lot if at most c = 1 is defective. If a lot is 5%…
- Lots of N = 1,000 are checked with the plan n = 20, c = 1. Rejected lots are screened 100% and all defectives replaced; in accepted lots…
- Match each acceptance-sampling term with its meaning. 1. AQL 2. LTPD 3. Producer's risk (α) 4. Consumer's risk (β) a. Probability of…
- A sampling plan inspects n = 50 items and accepts the lot if c ≤ 2 defectives are found. Using the Poisson approximation, what is the…
- Over 40 replenishment cycles a store ran out of an item in 5 cycles. Customers asked for 4,500 units in total, of which 4,230 were…