Lots of N = 1,000 are checked with the plan n = 20, c = 1. Rejected lots are screened 100% and all defectives replaced; in accepted lots only the sampled defectives are replaced. If incoming quality is 5% defective, what is the average outgoing quality (AOQ)?

  1. A. ≈ 3.61%
  2. B. ≈ 3.68%
  3. C. 5.00%
  4. D. ≈ 1.32%

Correct answer: A. ≈ 3.61%

P(accept) ≈ 0.7358. AOQ = p × Pa × (N − n) ÷ N = 0.05 × 0.7358 × 980 ÷ 1,000 ≈ 3.61%. Dropping the (N − n)/N factor gives 3.68%; using the rejection probability gives 1.32%. Rejected lots leave defect-free, which is why AOQ is below 5%.