Three stations in series each take 1 minute per unit. A batch of 50 units moves from station to station only when the whole batch is done. With one-piece flow instead, units move one at a time. When does the first unit of the order finish in each case?

  1. A. Batch: after 52 minutes; one-piece flow: after 3 minutes
  2. B. Batch: after 150 minutes; one-piece flow: after 52 minutes
  3. C. Batch: after 150 minutes; one-piece flow: after 3 minutes
  4. D. Both after 150 minutes, because total work is the same

Correct answer: C. Batch: after 150 minutes; one-piece flow: after 3 minutes

With transfer batches of 50, no unit leaves station 3 until all three stations have each spent 50 minutes: 150 minutes. One-piece flow finishes the first unit in 3 minutes and the whole order in 52 minutes – the same work, much shorter lead time.