A process has mean 50, standard deviation 2, USL 56 and LSL 40. What is its Cpk?

  1. A. 1.33
  2. B. 1.00
  3. C. 1.67
  4. D. 3.00

Correct answer: B. 1.00

Cpu = (56 - 50)/(3 x 2) = 1.00 and Cpl = (50 - 40)/6 = 1.67; Cpk is the smaller, 1.00. Cp = 16/12 = 1.33 ignores centring; 3.00 is the Z-score to the nearer limit.