Quantitative AptitudeHardSSC CGL · RRB NTPC · IBPS

A can do a piece of work in 15 days. He works for 6 days and leaves. B completes the remaining work in 9 days. In how many days can B alone do the whole work?

  1. A. 9 days
  2. B. 19 days
  3. C. 18 days
  4. D. 15 days

Correct answer: D. 15 days

A does 6/15 of the work, leaving 0.6. B does 0.6 of the work in 9 days, so the whole takes 9/0.6 = 15 days.