Management & CommerceVery hardOps MT · Supply chain · MBA placement pattern
Station A takes 10 min per unit and Station B takes 12 min per unit. After Station B, 20% of units fail inspection and go back through Station B once (rework takes the full 12 minutes and always succeeds). What is the line's output in an 8-hour shift?
- A. 48.0 units
- B. 33.3 units
- C. 40.0 units
- D. 32.0 units
Correct answer: B. 33.3 units
Each good unit needs 1.2 passes at B: 1.2 × 12 = 14.4 min. B's capacity = 60/14.4 = 4.167 units/hr (A: 6/hr), so B is the bottleneck. Output = 4.167 × 8 = 33.3 units. 40 ignores rework; 32 treats the 20% as scrap.
Practise more Operations, Supply Chain & Business Analytics questionsOperations, Supply Chain & Business Analytics: notes and key points
More Operations, Supply Chain & Business Analytics questions
- A retailer sells ₹30 lakh a month at a 25% gross margin (on sales) and carries an average inventory of ₹45 lakh at cost. Holding cost is…
- Jobs arrive at 10 per hour (M/M/1). Option A: a server who handles 12 jobs/hr, costing ₹200/hr. Option B: a server who handles 15 jobs/hr…
- In the Theory of Constraints, which scheduling method paces the whole plant to the bottleneck, protects it with a time buffer and releases…
- Planned production time is 480 minutes, of which 60 minutes are lost to breakdowns. The ideal cycle time is 0.5 min/unit. The machine…
- Monthly sales of a product were 120, 135, 150 and 141 units (oldest first). What is the 3-month moving-average forecast for the next month?
- Sales were 200 (Jan), 220 (Feb) and 250 (Mar). Using a weighted moving average with weights 0.5, 0.3 and 0.2, the heaviest weight on the…