A p-chart has p̄ = 0.05, and sample sizes vary. Sample A (n = 100) has 11 defectives; sample B (n = 400) has 34 defectives. Using 3-sigma limits computed for each sample's own size, which sample signals out of control?
- A. Only A
- B. Both A and B
- C. Only B
- D. Neither A nor B
Correct answer: C. Only B
UCL = p̄ + 3√(p̄(1 − p̄)/n). For n = 100, UCL ≈ 0.1154, and A's 0.11 is inside. For n = 400, UCL ≈ 0.0827, and B's 0.085 is outside. A larger sample has tighter limits, so the smaller proportion is the signal.
Practise more Operations, Supply Chain & Business Analytics questionsOperations, Supply Chain & Business Analytics: notes and key points
More Operations, Supply Chain & Business Analytics questions
- A Six Sigma team is analysing a late-delivery problem. In which DMAIC phase would it normally carry out a measurement system analysis…
- Activity A takes 5 days. Activity B takes 4 days and has two links with A: it can start no earlier than 2 days after A starts…
- At a project review, earned value is ₹40 lakh, planned value ₹50 lakh and actual cost ₹35 lakh. Which statement is correct?
- A maximisation LP has 3 '≤' constraints and 4 decision variables. After adding slack variables, how many variables are basic in any basic…
- A resource's shadow price in an LP is ₹12 per hour, valid for right-hand-side values between 80 and 140 hours; the current availability is…
- For a decision, the expected value of perfect information is ₹18 lakh and the expected value of the sample information from a proposed…