Quantitative AptitudeHardSSC CHSL · SBI PO pattern

A and B can do a job in 20 and 30 days respectively. They start together but A leaves 4 days before the job is complete. The job takes in total:

  1. A. 15 days
  2. B. 12 days
  3. C. 14.4 days
  4. D. 16 days

Correct answer: C. 14.4 days

Let the total be x days: (x − 4)/20 + x/30 = 1 gives 3(x − 4) + 2x = 60, so x = 14.4 days. 12 days is the time they would take together, with no one leaving.