Quantitative AptitudeVery hardIBPS PO · SSC CGL
A and B can do a job in 20 and 30 days. They work together for some days; then A leaves and B completes the rest of the work in 10 more days. The number of days they worked together is
- A. 8 days
- B. 6 days
- C. 10 days
- D. 12 days
Correct answer: A. 8 days
B does 10/30 = 1/3 alone, so the joint work is 2/3 at the rate 1/20 + 1/30 = 1/12 per day, taking 8 days.