On a learning-curve job, the 4th unit took 72 hours and the 16th unit took 46.08 hours. What is the learning rate?
- A. 64%
- B. 90%
- C. 80%
- D. 85%
Correct answer: C. 80%
From unit 4 to unit 16 there are two doublings (4 → 8 → 16). So rate² = 46.08 ÷ 72 = 0.64, and rate = 0.8, i.e. 80%. Taking 0.64 itself as the rate forgets that two doublings occurred.
Practise more Operations, Supply Chain & Business Analytics questionsOperations, Supply Chain & Business Analytics: notes and key points
More Operations, Supply Chain & Business Analytics questions
- A cooling system has a controller (reliability 0.98) in series with a pair of identical pumps in parallel, each with reliability 0.90; the…
- A packing line has three stages in series: a feeder (reliability 0.95), a sealing stage with two identical sealers in parallel (each 0.80…
- A critical sensor has reliability 0.85. Identical sensors can be installed in parallel (the stage works if at least one works). What is…
- A buyer uses a single sampling plan: inspect n = 20 items from each lot and accept the lot if at most c = 1 is defective. If a lot is 5%…
- Lots of N = 1,000 are checked with the plan n = 20, c = 1. Rejected lots are screened 100% and all defectives replaced; in accepted lots…
- Match each acceptance-sampling term with its meaning. 1. AQL 2. LTPD 3. Producer's risk (α) 4. Consumer's risk (β) a. Probability of…