Products P and Q share two machines, each available 480 min/day. P needs 3 min on M1 and 4 min on M2; Q needs 5 min on M1 and 2 min on M2. Current daily demand is 60 P and 40 Q. By what maximum percentage can both demands be increased in the same proportion?
- A. 20.8%
- B. 50.0%
- C. 26.3%
- D. 33.3%
Correct answer: C. 26.3%
M1 load = 60×3 + 40×5 = 380 min; M2 load = 60×4 + 40×2 = 320 min. M1 binds: scale ≤ 480/380 = 1.2632, i.e. an increase of 26.3%. 50% is M2's headroom; 20.8% is M1's idle share of 480, not the headroom relative to the load.
Practise more Operations, Supply Chain & Business Analytics questionsOperations, Supply Chain & Business Analytics: notes and key points
More Operations, Supply Chain & Business Analytics questions
- Station A takes 10 min per unit and Station B takes 12 min per unit. After Station B, 20% of units fail inspection and go back through…
- A retailer sells ₹30 lakh a month at a 25% gross margin (on sales) and carries an average inventory of ₹45 lakh at cost. Holding cost is…
- Jobs arrive at 10 per hour (M/M/1). Option A: a server who handles 12 jobs/hr, costing ₹200/hr. Option B: a server who handles 15 jobs/hr…
- In the Theory of Constraints, which scheduling method paces the whole plant to the bottleneck, protects it with a time buffer and releases…
- Planned production time is 480 minutes, of which 60 minutes are lost to breakdowns. The ideal cycle time is 0.5 min/unit. The machine…
- Monthly sales of a product were 120, 135, 150 and 141 units (oldest first). What is the 3-month moving-average forecast for the next month?