Management & CommerceHardMBA Placement · Operations · Analytics

A line must produce 480 units in an 8-hour shift. The total work content of all tasks is 5.4 minutes per unit. With perfect balancing, the minimum number of stations and the resulting line efficiency are

  1. A. 5 stations, 108%
  2. B. 6 stations, 90%
  3. C. 6 stations, 100%
  4. D. 7 stations, 77%

Correct answer: B. 6 stations, 90%

Takt time = 480 min/480 units = 1.0 min, so stations ≥ 5.4/1.0 = 5.4 → 6. Efficiency = 5.4/(6 × 1.0) = 90%. Five stations would need more than the takt time at some station.