A can do a piece of work in 20 days. He works for 4 days and leaves. B completes the remaining work in 12 days. In how many days can B alone do the whole work?

  1. A. 12 days
  2. B. 15 days
  3. C. 19 days
  4. D. 28 days

Correct answer: B. 15 days

A does 4/20 of the work, leaving 0.8. B does 0.8 of the work in 12 days, so the whole takes 12/0.8 = 15 days.