Quantitative AptitudeVery hardSSC CGL · RRB NTPC · IBPS Clerk

A and B can do a job in 6 and 8 days. With C's help they finish it in 3 days. If ₹1,200 is paid for the whole job, C's share is:

  1. A. ₹150
  2. B. ₹300
  3. C. ₹200
  4. D. ₹250

Correct answer: A. ₹150

In 3 days A does 1/2 and B does 3/8, so C did 1 − 7/8 = 1/8. Shares are in the ratio 4 : 3 : 1, so C gets 1,200/8 = ₹150. ₹300 would correspond to 1/4 of the work.