Quantitative AptitudeHardIBPS PO · SSC CGL

A is 25% more efficient than B. If A alone can finish a job in 20 days, A and B together will finish it in

  1. A. 10 days
  2. B. 11.11 days
  3. C. 12.5 days
  4. D. 11.5 days

Correct answer: B. 11.11 days

B takes 20 × 1.25 = 25 days; together 1/20 + 1/25 = 9/100 per day, so 100/9 ≈ 11.11 days.