A, B and C can complete a job in 10, 15 and 30 days respectively. A and B start the work; C joins them after 2 days and A leaves after 5 days from the start. B and C then finish the job. The total time taken is

  1. A. 5 1/3 days
  2. B. 6 days
  3. C. 5 2/3 days
  4. D. 5 days

Correct answer: C. 5 2/3 days

In units of 1/30: A, B, C do 3, 2, 1 per day. Days 1–2 give 10, days 3–5 give 18, total 28; the remaining 2 units at 3 per day take 2/3 day. Total 5 2/3 days.