Markets with annual loads: M1 at (2, 8) with 300, M2 at (6, 2) with 150 and M3 at (9, 6) with 550. Distances are rectilinear. What location minimises total load × distance, and what is that minimum?
- A. (6.45, 6); 4,005
- B. (6, 6); 4,050
- C. (9, 8); 4,550
- D. (9, 6); 3,750
Correct answer: D. (9, 6); 3,750
With rectilinear distance, use the weighted median on each axis (half the load = 500). X sorted: 2 (300), 6 (cumulative 450), 9 (1,000) → median x = 9. Y sorted: 2 (150), 6 (cumulative 700) → median y = 6. Cost at (9, 6) = 300 × (7 + 2) + 150 × (3 + 4) + 0 = 2,700 + 1,050 = 3,750. The centre of gravity (6.45, 6) costs 4,005 — it is not the rectilinear optimum.
Practise more Operations, Supply Chain & Business Analytics questionsOperations, Supply Chain & Business Analytics: notes and key points
More Operations, Supply Chain & Business Analytics questions
- Twenty units are life-tested for 1,000 hours each; any unit that fails is replaced at once, so the test covers 20,000 unit-hours, and 4…
- The first unit of a new aircraft sub-assembly took 100 labour hours. The work follows an 80% unit learning curve. How long should the 8th…
- Unit 1 of a custom machine took 200 hours, and production follows an 85% unit learning curve. Approximately how many hours will unit 10…
- A contractor's first unit took 50 hours and work follows a 90% unit learning curve (Tₙ = T₁ × n^b, b = log 0.9 ÷ log 2 ≈ −0.152). Four…
- On a learning-curve job, the 4th unit took 72 hours and the 16th unit took 46.08 hours. What is the learning rate?
- A cooling system has a controller (reliability 0.98) in series with a pair of identical pumps in parallel, each with reliability 0.90; the…